Title: Draft final risk assessment lime settling basins. Version 2. 1

Technical Report ·
OSTI ID:5334034

The preferred alternative Lime Settling Basins (LSB) Interim Response Action (IRA) selected to inhibit further migration of contaminants from the LSB included moving the stockpiled lime sludge adjacent to the LSB back into the LSB, the construction of a subsurface barrier (i.e., slurry wall), placement of a soil cap and vegative cover, and the installation of a groundwater extraction system. This IRA is expected to be completed in approximately 6 months. The LSB IRA Risk Assessment (RA) presents the methodologies, quantitative and qualitative results, and assumptions used to determine if a potential risk exists to humans and biota from the activities of the LSB IRA. The activities associated with the relocation of the lime sludge into the LSB and the installation of the slurry wall are the focus of this RA, since they include disturbance of soils identified as contaminated.

Research Organization:
Ebasco Services, Inc., New York, NY (United States)
OSTI ID:
5334034
Report Number(s):
AD-A-274203/9/XAB; CNN: DAAA15-88-D-0024
Country of Publication:
United States
Language:
English