Final decision document for the interim response action at the lime settling basins, Rocky Mountain Arsenal, version 4.0
Technical Report
·
OSTI ID:121863
The objective of the interim response action at the lime settling basins is to mitigate the threat of releases from the basins. The proposed IRA consists of: (1) relocation of sludge material to the settling basin; (2) construction of a 360 degree subsurface barrier around the basins; (3) construction of a soil and vegetative cover over the material; and (4) installation of a ground water extraction system. This decision document provides summaries of: (1) alternative technologies considered, (2) significant events leading to the initiation of the IRA, (3) the IRA Project, and (4) applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR`s) associated with the program.
- Research Organization:
- Woodward-Clyde Consultants, Denver, CO (United States)
- OSTI ID:
- 121863
- Report Number(s):
- AD-A--295127/5/XAB; DAAA--15-88-D-0022
- Country of Publication:
- United States
- Language:
- English
Similar Records
Final decision document for the interim response action at the M-1 Settling Basins, Rocky Mountain Arsenal, Version 4. 0. Final report
Draft final risk assessment lime settling basins. Version 2. 1
Cutoff walls and cap for lime and M-1 settling basins, Rocky Mountain Arsenal, Colorado. Part 1: Final design analysis. Final report
Technical Report
·
Wed Feb 28 23:00:00 EST 1990
·
OSTI ID:5581874
Draft final risk assessment lime settling basins. Version 2. 1
Technical Report
·
Thu Oct 25 00:00:00 EDT 1990
·
OSTI ID:5334034
Cutoff walls and cap for lime and M-1 settling basins, Rocky Mountain Arsenal, Colorado. Part 1: Final design analysis. Final report
Technical Report
·
Mon Oct 01 00:00:00 EDT 1990
·
OSTI ID:128131