Final decision document for the interim response action at the lime settling basins, Rocky Mountain Arsenal, version 4.0

Technical Report ·
OSTI ID:121863
The objective of the interim response action at the lime settling basins is to mitigate the threat of releases from the basins. The proposed IRA consists of: (1) relocation of sludge material to the settling basin; (2) construction of a 360 degree subsurface barrier around the basins; (3) construction of a soil and vegetative cover over the material; and (4) installation of a ground water extraction system. This decision document provides summaries of: (1) alternative technologies considered, (2) significant events leading to the initiation of the IRA, (3) the IRA Project, and (4) applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR`s) associated with the program.
Research Organization:
Woodward-Clyde Consultants, Denver, CO (United States)
OSTI ID:
121863
Report Number(s):
AD-A--295127/5/XAB; DAAA--15-88-D-0022
Country of Publication:
United States
Language:
English