Final decision document for the interim response action at the M-1 Settling Basins, Rocky Mountain Arsenal, Version 4. 0. Final report
Technical Report
·
OSTI ID:5581874
The objective of the interim response action at the M-1 settling basins is to mitigate the threat of release of contaminants from the basins which are a direct source of as contamination to the ground water. The proposed IRA consists of (1) construction of a 360 degree subsurface barrier and (2) treatment of the wastes with in-situ vitrification. This decision document provides summaries of: (1) alternative technologies considered; (2) significant events leading to the initiation of the IRA; (3) the IRA project; and (4) applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR's) associated with the program.
- Research Organization:
- Woodward-Clyde Consultants, Denver, CO (United States)
- OSTI ID:
- 5581874
- Report Number(s):
- AD-A-271371/7/XAB; CNN: DAAA15-88-D-0022
- Country of Publication:
- United States
- Language:
- English
Similar Records
Final decision document for the interim response action at the lime settling basins, Rocky Mountain Arsenal, version 4.0
Final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 4. 0
Draft final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 3.1. Draft (Final) report
Technical Report
·
Wed Feb 28 23:00:00 EST 1990
·
OSTI ID:121863
Final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 4. 0
Technical Report
·
Wed Jan 31 23:00:00 EST 1990
·
OSTI ID:5710483
Draft final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 3.1. Draft (Final) report
Technical Report
·
Wed Jan 31 23:00:00 EST 1990
·
OSTI ID:415876
Related Subjects
54 ENVIRONMENTAL SCIENCES
540250* -- Environment
Terrestrial-- Site Resource & Use Studies-- (1990-)
CONTAMINATION
COST ESTIMATION
GROUND WATER
HYDROGEN COMPOUNDS
IN-SITU PROCESSING
LEVELS
MANAGEMENT
MILITARY FACILITIES
OXYGEN COMPOUNDS
POLLUTION ABATEMENT
PONDS
PROCESSING
PUBLIC HEALTH
RISK ASSESSMENT
SAFETY STANDARDS
SETTLING PONDS
STANDARDS
SURFACE WATERS
TECHNOLOGY ASSESSMENT
UNDERGROUND
VITRIFICATION
WASTE DISPOSAL
WASTE MANAGEMENT
WATER
WATER POLLUTION ABATEMENT
540250* -- Environment
Terrestrial-- Site Resource & Use Studies-- (1990-)
CONTAMINATION
COST ESTIMATION
GROUND WATER
HYDROGEN COMPOUNDS
IN-SITU PROCESSING
LEVELS
MANAGEMENT
MILITARY FACILITIES
OXYGEN COMPOUNDS
POLLUTION ABATEMENT
PONDS
PROCESSING
PUBLIC HEALTH
RISK ASSESSMENT
SAFETY STANDARDS
SETTLING PONDS
STANDARDS
SURFACE WATERS
TECHNOLOGY ASSESSMENT
UNDERGROUND
VITRIFICATION
WASTE DISPOSAL
WASTE MANAGEMENT
WATER
WATER POLLUTION ABATEMENT