Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Draft final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 3.1. Draft (Final) report

Technical Report ·
OSTI ID:415876
The objective of the interim response action at the Motor Pool Area is to mitigate the threat of releases of trichloroethane. The proposed IRA will consist of the installation of a vapor extraction system to remove and treat the soil contamination at an identified source of trichloroethane at the Moror pool. A ground water extraction and treatment system will be installed to contain the trichloroethane plume emanating from the area. This decision document provides summaries of: (1) alternative technologies considered; (2) significant events leading to the initiation of the IRA; (3) the IRA project; and (4) applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR`S) associated with the program.
Research Organization:
Woodward-Clyde Consultants, Denver, CO (United States)
OSTI ID:
415876
Report Number(s):
AD-A--312956/6/XAB; CNN: Contract DAAA15-88-D-0022
Country of Publication:
United States
Language:
English