Draft final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 3.1. Draft (Final) report
Technical Report
·
OSTI ID:415876
The objective of the interim response action at the Motor Pool Area is to mitigate the threat of releases of trichloroethane. The proposed IRA will consist of the installation of a vapor extraction system to remove and treat the soil contamination at an identified source of trichloroethane at the Moror pool. A ground water extraction and treatment system will be installed to contain the trichloroethane plume emanating from the area. This decision document provides summaries of: (1) alternative technologies considered; (2) significant events leading to the initiation of the IRA; (3) the IRA project; and (4) applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR`S) associated with the program.
- Research Organization:
- Woodward-Clyde Consultants, Denver, CO (United States)
- OSTI ID:
- 415876
- Report Number(s):
- AD-A--312956/6/XAB; CNN: Contract DAAA15-88-D-0022
- Country of Publication:
- United States
- Language:
- English
Similar Records
Final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 4. 0
Final decision document for the interim response action at the lime settling basins, Rocky Mountain Arsenal, version 4.0
Soil vapor extraction pilot study report, motor pool area, Rocky Mountain Arsenal. Version 3.1
Technical Report
·
Wed Jan 31 23:00:00 EST 1990
·
OSTI ID:5710483
Final decision document for the interim response action at the lime settling basins, Rocky Mountain Arsenal, version 4.0
Technical Report
·
Wed Feb 28 23:00:00 EST 1990
·
OSTI ID:121863
Soil vapor extraction pilot study report, motor pool area, Rocky Mountain Arsenal. Version 3.1
Technical Report
·
Sat Feb 29 23:00:00 EST 1992
·
OSTI ID:381545