Soil vapor extraction pilot study report, motor pool area, Rocky Mountain Arsenal. Version 3.1
Technical Report
·
OSTI ID:381545
This Soil Vapor Extraction Pilot Study Report for the Motor Pool Area at the Rocky Mountain Arsenal (RMA) is being prepared as part of the Interim Response Action (IRA). The recommended action at the motor pool area was to address contaminated soil with in situ soil vapor extraction and to address contaminated groundwater. This document presents the results of the soil vapor extraction pilot study conducted between July and December 1991 at the motor pool area.
- Research Organization:
- Woodward-Clyde Consultants, Omaha, NE (United States)
- OSTI ID:
- 381545
- Report Number(s):
- AD-A--310933/7/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Draft final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 3.1. Draft (Final) report
Final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 4. 0
Alternatives assessment of interim response actions for other contamination sources. Motor pool area. Final report
Technical Report
·
Wed Jan 31 23:00:00 EST 1990
·
OSTI ID:415876
Final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 4. 0
Technical Report
·
Wed Jan 31 23:00:00 EST 1990
·
OSTI ID:5710483
Alternatives assessment of interim response actions for other contamination sources. Motor pool area. Final report
Technical Report
·
Tue Oct 31 23:00:00 EST 1989
·
OSTI ID:5607879