Alternatives assessment of interim response actions for other contamination sources. Motor pool area. Final report
Technical Report
·
OSTI ID:5607879
The Interim Response Action (IRA) Alternative Assessment Document describes the process and results of the alternative assessment conducted for the Motor Pool Area at the Rocky Mountain Arsenal (RMA). The Motor Pool Area is located in Section 4 of RMA. The Motor Pool Area appears to be a potential source of trichloroethylene (TCE) contamination to the groundwater. This evaluation is discussed in subsection 2.2.2. The goal of this assessment document is to evaluate alternatives based upon, but not limited to, factors such as the protection of human health and the environment, mitigation of the threat to human health, and the reasonableness of cost and timeliness. The assessment seeks to balance preferences for treatment on site and for responses that permanently reduce the mobility, toxicity, or volume of hazardous substances against the need, in the context of removal actions, for consistency with the final remedy and for responses that are practical, cost-efficient, and that reduce or control hazards posed by the site as early as possible.
- Research Organization:
- Woodward-Clyde Consultants, Denver, CO (United States)
- OSTI ID:
- 5607879
- Report Number(s):
- AD-A-271681/9/XAB; CNN: DAAA15-88-D-0022/0002
- Country of Publication:
- United States
- Language:
- English
Similar Records
Soil vapor extraction pilot study report, motor pool area, Rocky Mountain Arsenal. Version 3.1
Superfund record of decision (EPA Region 8): Rocky Mountain Arsenal, Operable Unit 27, Commerce City, CO, September 1993
Final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 4. 0
Technical Report
·
Sat Feb 29 23:00:00 EST 1992
·
OSTI ID:381545
Superfund record of decision (EPA Region 8): Rocky Mountain Arsenal, Operable Unit 27, Commerce City, CO, September 1993
Technical Report
·
Wed Sep 01 00:00:00 EDT 1993
·
OSTI ID:6911721
Final decision document for the interim response action at the Motor Pool Area, Rocky Mountain Arsenal, version 4. 0
Technical Report
·
Wed Jan 31 23:00:00 EST 1990
·
OSTI ID:5710483