Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Cutoff walls and cap for lime and M-1 settling basins, Rocky Mountain Arsenal, Colorado. Part 1: Final design analysis. Final report

Technical Report ·
OSTI ID:128131
This document consists of 2 parts, final design analysis and specifications. The purpose of the project was to develop a design for the Interim Response Actions (IRA) at the Lime and M-l Settling Basins at Rocky Mountain Arsenal (RMA), Commerce City, Colorado. The purpose of the IRA at the Lime and M-l Settling Basins is to mitigate the threat of release from the Basins on an interim basis, pending determination of the final remedy in the Onpost Record of Decision (ROD). The IRA for the M-l Basins also includes treatment of the waste materials in the basins with in-situ vitrification (ISV), which is being designed by contract with Woodward-Clyde Consultants.
Research Organization:
Rocky Mountain Arsenal, Denver, CO (United States)
OSTI ID:
128131
Report Number(s):
AD-A--295551/6/XAB; RMA--90312R02-PT-1
Country of Publication:
United States
Language:
English