Cutoff walls and cap for lime and M-1 settling basins, Rocky Mountain Arsenal, Colorado. Part 1: Final design analysis. Final report
Technical Report
·
OSTI ID:128131
This document consists of 2 parts, final design analysis and specifications. The purpose of the project was to develop a design for the Interim Response Actions (IRA) at the Lime and M-l Settling Basins at Rocky Mountain Arsenal (RMA), Commerce City, Colorado. The purpose of the IRA at the Lime and M-l Settling Basins is to mitigate the threat of release from the Basins on an interim basis, pending determination of the final remedy in the Onpost Record of Decision (ROD). The IRA for the M-l Basins also includes treatment of the waste materials in the basins with in-situ vitrification (ISV), which is being designed by contract with Woodward-Clyde Consultants.
- Research Organization:
- Rocky Mountain Arsenal, Denver, CO (United States)
- OSTI ID:
- 128131
- Report Number(s):
- AD-A--295551/6/XAB; RMA--90312R02-PT-1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Final decision document for the interim response action at the lime settling basins, Rocky Mountain Arsenal, version 4.0
Draft final risk assessment lime settling basins. Version 2. 1
Final decision document for the interim response action at the M-1 Settling Basins, Rocky Mountain Arsenal, Version 4. 0. Final report
Technical Report
·
Wed Feb 28 23:00:00 EST 1990
·
OSTI ID:121863
Draft final risk assessment lime settling basins. Version 2. 1
Technical Report
·
Thu Oct 25 00:00:00 EDT 1990
·
OSTI ID:5334034
Final decision document for the interim response action at the M-1 Settling Basins, Rocky Mountain Arsenal, Version 4. 0. Final report
Technical Report
·
Wed Feb 28 23:00:00 EST 1990
·
OSTI ID:5581874