Draft final risk assessment lime settling basins. Version 2. 1
Technical Report
·
OSTI ID:5334034
The preferred alternative Lime Settling Basins (LSB) Interim Response Action (IRA) selected to inhibit further migration of contaminants from the LSB included moving the stockpiled lime sludge adjacent to the LSB back into the LSB, the construction of a subsurface barrier (i.e., slurry wall), placement of a soil cap and vegative cover, and the installation of a groundwater extraction system. This IRA is expected to be completed in approximately 6 months. The LSB IRA Risk Assessment (RA) presents the methodologies, quantitative and qualitative results, and assumptions used to determine if a potential risk exists to humans and biota from the activities of the LSB IRA. The activities associated with the relocation of the lime sludge into the LSB and the installation of the slurry wall are the focus of this RA, since they include disturbance of soils identified as contaminated.
- Research Organization:
- Ebasco Services, Inc., New York, NY (United States)
- OSTI ID:
- 5334034
- Report Number(s):
- AD-A-274203/9/XAB; CNN: DAAA15-88-D-0024
- Country of Publication:
- United States
- Language:
- English
Similar Records
Final decision document for the interim response action at the lime settling basins, Rocky Mountain Arsenal, version 4.0
Cutoff walls and cap for lime and M-1 settling basins, Rocky Mountain Arsenal, Colorado. Part 1: Final design analysis. Final report
Final decision document for the interim response action at the M-1 Settling Basins, Rocky Mountain Arsenal, Version 4. 0. Final report
Technical Report
·
Wed Feb 28 23:00:00 EST 1990
·
OSTI ID:121863
Cutoff walls and cap for lime and M-1 settling basins, Rocky Mountain Arsenal, Colorado. Part 1: Final design analysis. Final report
Technical Report
·
Mon Oct 01 00:00:00 EDT 1990
·
OSTI ID:128131
Final decision document for the interim response action at the M-1 Settling Basins, Rocky Mountain Arsenal, Version 4. 0. Final report
Technical Report
·
Wed Feb 28 23:00:00 EST 1990
·
OSTI ID:5581874
Related Subjects
54 ENVIRONMENTAL SCIENCES
540250* -- Environment
Terrestrial-- Site Resource & Use Studies-- (1990-)
ALKALINE EARTH METAL COMPOUNDS
CALCIUM COMPOUNDS
CALCIUM OXIDES
CHALCOGENIDES
CONTROL
LAND POLLUTION CONTROL
OXIDES
OXYGEN COMPOUNDS
POLLUTION CONTROL
PONDS
REMEDIAL ACTION
RISK ASSESSMENT
SETTLING PONDS
SURFACE WATERS
WATER POLLUTION CONTROL
540250* -- Environment
Terrestrial-- Site Resource & Use Studies-- (1990-)
ALKALINE EARTH METAL COMPOUNDS
CALCIUM COMPOUNDS
CALCIUM OXIDES
CHALCOGENIDES
CONTROL
LAND POLLUTION CONTROL
OXIDES
OXYGEN COMPOUNDS
POLLUTION CONTROL
PONDS
REMEDIAL ACTION
RISK ASSESSMENT
SETTLING PONDS
SURFACE WATERS
WATER POLLUTION CONTROL