Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Progress in Multi-Batch Slip Stacking in the Fermilab Main Injector and Future Plans

Conference ·
OSTI ID:952260

The multi-batch slip stacking has been used for operations since January, 2008 and effectively increased proton intensity to the NuMI target by 50% in a Main Injector (MI) cycle. The MI accepts 11 batches at injection energy from the Booster, and sends two batches to antiproton production and nine to the NuMI beam line. The total beam power in a cycle was increased to 340 kW on average. We have been doing beam studies in order to increase the beam power to 400 kW and to control the beam loss. We will also discuss 12 batch slip stacking scheme which is going to be used for future neutrino experiments.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
952260
Report Number(s):
FERMILAB-CONF-09-155-AD
Country of Publication:
United States
Language:
English

Similar Records

Multi-batch slip stacking in the Main Injector at Fermilab
Conference · Fri Jun 01 00:00:00 EDT 2007 · OSTI ID:913474

Current and Future High Power Operation of Fermilab Main Injector
Conference · Wed Apr 01 00:00:00 EDT 2009 · OSTI ID:952269

Synchronization of the Fermilab Booster and Main Injector for multiple batch injection
Conference · Fri Jul 09 00:00:00 EDT 2004 · OSTI ID:825675