Progress in Multi-Batch Slip Stacking in the Fermilab Main Injector and Future Plans
Conference
·
OSTI ID:952260
The multi-batch slip stacking has been used for operations since January, 2008 and effectively increased proton intensity to the NuMI target by 50% in a Main Injector (MI) cycle. The MI accepts 11 batches at injection energy from the Booster, and sends two batches to antiproton production and nine to the NuMI beam line. The total beam power in a cycle was increased to 340 kW on average. We have been doing beam studies in order to increase the beam power to 400 kW and to control the beam loss. We will also discuss 12 batch slip stacking scheme which is going to be used for future neutrino experiments.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 952260
- Report Number(s):
- FERMILAB-CONF-09-155-AD; TRN: US0902453
- Resource Relation:
- Conference: Presented at Particle Accelerator Conference (PAC 09), Vancouver, BC, Canada, 4-8 May 2009
- Country of Publication:
- United States
- Language:
- English
Similar Records
Multi-batch slip stacking in the Main Injector at Fermilab
Current and Future High Power Operation of Fermilab Main Injector
Cycle-to-cycle extraction synchronization of the Fermilab Booster for multiple batch injection to the Main Injector
Conference
·
Fri Jun 01 00:00:00 EDT 2007
·
OSTI ID:952260
+4 more
Current and Future High Power Operation of Fermilab Main Injector
Conference
·
Wed Apr 01 00:00:00 EDT 2009
·
OSTI ID:952260
+6 more
Cycle-to-cycle extraction synchronization of the Fermilab Booster for multiple batch injection to the Main Injector
Conference
·
Sun May 01 00:00:00 EDT 2005
·
OSTI ID:952260