Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Current and Future High Power Operation of Fermilab Main Injector

Conference ·
OSTI ID:952269

Fermilab's Main Injector on acceleration cycles to 120 GeV has been running a mixed mode operation delivering beam to both the antiproton source for pbar production and to the NuMI[1] target for neutrino production since 2005. On January 2008 the slip stacking process used to increase the beam to the pbar target was expanded to include the beam to the NuMI target increasing the MI beam power at 120 GeV to 400KW. The current high power MI operation will be described along with the plans to increase the power to 700KW for NOvA and to 2.1 MW for project X.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
952269
Report Number(s):
FERMILAB-CONF-09-151-AD
Country of Publication:
United States
Language:
English

Similar Records

MI high power operation and future plans
Conference · Mon Sep 01 00:00:00 EDT 2008 · OSTI ID:940840

Progress in Multi-Batch Slip Stacking in the Fermilab Main Injector and Future Plans
Conference · Tue Apr 01 00:00:00 EDT 2008 · OSTI ID:952260

Lattice measurement for Fermilab Main Injector
Conference · Fri Jun 01 00:00:00 EDT 2007 · OSTI ID:913472