Synchronization of the Fermilab Booster and Main Injector for multiple batch injection
- Fermilab
To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6 or more Booster batches simultaneously; the first will be extracted to the antiproton source, while the remaining are extracted for the NuMI/MINOS (Neutrinos at the Main Injector/Main Injector Neutrino Oscillation Search) neutrino experiment. Performing this multi-batch operation while avoiding unacceptable radioactivation of the beamlines requires a previously unnecessary synchronization between the accelerators. We describe a mechanism and present results of advancing or retarding the longitudinal progress of the Booster beam by active feedback radial manipulation of the beam during the acceleration period.
- Research Organization:
- Fermi National Accelerator Lab., Batavia, IL (US)
- Sponsoring Organization:
- US Department of Energy; USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 825675
- Report Number(s):
- FERMILAB-Conf-04/105-AD
- Country of Publication:
- United States
- Language:
- English
Similar Records
Challenges to the Fermilab linac and booster accelerators
Progress in Multi-Batch Slip Stacking in the Fermilab Main Injector and Future Plans