Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Challenges to the Fermilab linac and booster accelerators

Conference ·
OSTI ID:782889

A report on the challenges confronting the Fermilab Linac and Booster accelerators is presented. Plans to face those challenges are discussed. Historically, the Linac/Booster system has served only as an injector for the relatively low repetition rate Main Ring synchrotron. With construction of an 8 GeV target station for the 5 Hz MiniBooNE neutrino beam and requirements for rapid multi-batch injection into the Main Injector for the NUMI/MINOS experiment, the demand for 8 GeV protons will increase more than an order of magnitude above recent high levels. To meet this challenge, enhanced ion source performance, better Booster orbit control, a beam loss collimation/localization system, and improved diagnostics are among the items being pursued. Booster beam loss reduction and control are key to the entire near future Fermilab high energy physics program.

Research Organization:
Fermi National Accelerator Lab., Batavia, IL (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
782889
Report Number(s):
FERMILAB-Conf-01/121
Country of Publication:
United States
Language:
English