Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Palo verde story: a foundation for future multi-station nuclear power plants

Conference · · Trans. Am. Nucl. Soc.; (United States)
OSTI ID:6234066

In 1973, the design and planning for the Palo Verde Nuclear Generating Station was started featuring three 3800 MWt Combustion Engineering Standard System 80 Nuclear Steam Supply Systems. Arizona Public Service Company (APS) was the Project Manager and Operating Agent and Bechtel Power Corporation the architect/engineer and constructor. The Palo Verde units are located in a desert environment some 50 miles west of Phoenix, Arizona. It is a dry site in that there are no liquid discharges from the site. The cooling tower makeup water sewage is waste effluent from the City of Phoenix treated at an on site reclamation facility. The effluent has had primary and secondary treatment at the Phoenix plant prior to delivery to PVNGS. The units are physically separate from each other but are of identical design. There are no shared safety systems between the units. This paper presents some of the engineering and management practices used during design, construction, and startup and operational experiences and other unique features of this multi-unit nuclear station.

Research Organization:
Arizona Public Service Company, Phoenix (USA)
OSTI ID:
6234066
Report Number(s):
CONF-870905-
Journal Information:
Trans. Am. Nucl. Soc.; (United States), Journal Name: Trans. Am. Nucl. Soc.; (United States) Vol. 56:1; ISSN TANSA
Country of Publication:
United States
Language:
English