A probabilistic model for US nuclear power construction times

Thesis/Dissertation ·
OSTI ID:5323723
Construction time for nuclear power plants is an important element in planning for resources to meet future load demands. Analysis of actual versus estimated construction times for past US nuclear power plants indicates that utilities have continuously underestimated their power plants' construction durations. The analysis also indicates that the actual average construction time has been increasing upward, and the actual durations of power plants permitted to construct in the same year varied substantially. This study presents two probabilistic models for nuclear power construction time for use by the nuclear industry as estimating tool. The study also presents a detailed explanation of the factors that are responsible for increasing and varying nuclear power construction times. Observations on 91 complete nuclear units were involved in three interdependent analyses in the process of explanation and derivation of the probabilistic models. The historical data was first utilized in the data envelopment analysis (DEA) for the purpose of obtaining frontier index measures for project management achievement in building nuclear power plants.
Research Organization:
Texas Univ., Austin, TX (USA)
OSTI ID:
5323723
Country of Publication:
United States
Language:
English

Similar Records

Nuclear unit construction/fuel-loading duration
Journal Article · Fri Nov 30 23:00:00 EST 1984 · IEEE Trans. Power Appar. Syst.; (United States) · OSTI ID:6856019

Probabilistic cost estimating of nuclear-power-plant construction projects
Conference · Sat Dec 31 23:00:00 EST 1977 · Trans. Am. Assoc. Cost Eng.; (United States) · OSTI ID:5085656

Analysis of nuclear power plant construction costs
Technical Report · Tue Dec 31 23:00:00 EST 1985 · OSTI ID:6071600