Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Analysis of nuclear power plant construction costs

Technical Report ·
DOI:https://doi.org/10.2172/6071600· OSTI ID:6071600
The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.
Research Organization:
USDOE Energy Information Administration, Washington, DC. Office of Coal, Nuclear, Electric and Alternate Fuels
OSTI ID:
6071600
Report Number(s):
DOE/EIA-0485; ON: DE86008419
Country of Publication:
United States
Language:
English

Similar Records

Electric utility power plant construction costs, 1st Edition
Book · Thu Dec 31 23:00:00 EST 1992 · OSTI ID:7285295

Analysis of power-plant-construction lead times. Volume 1. Analysis and results
Technical Report · Mon Jan 31 23:00:00 EST 1983 · OSTI ID:6344916

Nuclear unit construction/fuel-loading duration
Journal Article · Fri Nov 30 23:00:00 EST 1984 · IEEE Trans. Power Appar. Syst.; (United States) · OSTI ID:6856019