HNPF PRIMARY PIPE TUNNEL LEAK TEST REPORT
Technical Report
·
OSTI ID:4797422
Tests were made on the primary pipe tunnel of the Hallam Nuclear Power Facility to determine the leakage rate, to find minor leaks at penetrations into the tunnel, and to ascertain the structural integrity of the tunnel and of the nltrogen cooling units and associated ducting. The pipe tunnel was found to fulfill the requirements given in Supplement 4 of NAA-SR-5700 (safeguards report), namely, less than 2.1% standard volume leakage in 24 hr. (D.L.C.)
- Research Organization:
- Atomics International. Div. of North American Aviation, Inc., Canoga Park, Calif.
- DOE Contract Number:
- AT(11-1)-GEN-8
- NSA Number:
- NSA-16-012753
- OSTI ID:
- 4797422
- Report Number(s):
- TID-14980
- Country of Publication:
- United States
- Language:
- English
Similar Records
ADDITIONAL SAFEGUARDS EVALUATION FOR THE U-Mo FUELED CORE OF THE HALLAM NUCLEAR POWER FACILITY
Probabilistic leak analysis for LMFBR primary coolant piping
HNPF WASH CELL DEVELOPMENT
Technical Report
·
Wed Jul 01 00:00:00 EDT 1959
·
OSTI ID:4127986
Probabilistic leak analysis for LMFBR primary coolant piping
Technical Report
·
Fri Jul 01 00:00:00 EDT 1977
·
OSTI ID:5319969
HNPF WASH CELL DEVELOPMENT
Technical Report
·
Tue Aug 22 00:00:00 EDT 1961
·
OSTI ID:4815660