Design criteria manual guides CEM project
Journal Article
·
· Power Engineering (Barrington)
OSTI ID:103664
This article describes how a consultant team used surveys to develop a manual for state-of-the-art CEM systems at Allegheny Power System installations. In 1991, Allegheny Power Systems (APS) operating companies contracted an engineering consultant to install new continuous emission monitoring (CEM) systems on all power plant stacks. This planned action was to fulfill the APS goal of meeting present and future demand for electric power while protecting the environment. Black and Veatch, the engineering consultant chosen, programmed the addition of 63 CEM systems to 25 units in Pennsylvania, West Virginia and Maryland. Each system was designed to meet gas monitoring requirements of the 1990 Clean Air Act Amendments (CAAA).
- OSTI ID:
- 103664
- Journal Information:
- Power Engineering (Barrington), Journal Name: Power Engineering (Barrington) Journal Issue: 8 Vol. 99; ISSN POENAI; ISSN 0032-5961
- Country of Publication:
- United States
- Language:
- English
Similar Records
CEMS deadlines are near, utilities must get ready
Utility engineering`s experience in the design, equipment selection, installation and operation of CEMS for utilities
The design, development, and implementation of a data acquisition and handling system at Basin Electric Power Cooperative
Journal Article
·
Tue Jun 01 00:00:00 EDT 1993
· Electric Light and Power (Boston); (United States)
·
OSTI ID:5034253
Utility engineering`s experience in the design, equipment selection, installation and operation of CEMS for utilities
Conference
·
Fri Sep 01 00:00:00 EDT 1995
·
OSTI ID:94257
The design, development, and implementation of a data acquisition and handling system at Basin Electric Power Cooperative
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:271867