The design, development, and implementation of a data acquisition and handling system at Basin Electric Power Cooperative

Conference ·
OSTI ID:271867
; ; ;  [1];
  1. Black and Veatch, Kansas City, MO (United States)

The Clean Air Act Amendments of 1990 require all Phase 1 and 2 utilities to install Continuous Emissions Monitoring Systems (CEMS), which can consist of instrumentation including analyzers and a Data Acquisition and Handling System (DAHS). To meet these requirements, Basin Electric Power Cooperative contracted with Black and Veatch to design and develop a DAHS which would meet all 40 CFR Part 75 requirements. Basin Electric provided the specifications for the DAHS and the graphical user interface, and B and V designed, developed, and installed a DAHS at 3 units at Laramie River Station, 2 units at Antelope Valley Station, and 2 units at Leland Olds Station. B and V utilized the existing equipment, adding to it a unique DAHS design. B and V designed and implemented the DAHS which operates in the OS/2 environment to interface with multiple programmable logic controllers. This unique software was written in modular form so that multiple programs run in unison, monitoring each other for errors to ensure continuous operation. The reporting structure is flexible to allow for a variety of formats, including those specifically required by the state to meet CAAA guidelines. Today, these seven units are in operation and comply with the CAAA. This paper describes the issues faced during specification, general design, compliance, and implementation of the DAHS at BEPC, including the lessons learned. The continuous emissions monitoring (CEM) system for each unit at BEPC consisted of a set of dilution probe analyzers for measuring SO{sub 2}, NO{sub x}, and CO{sub 2}.

OSTI ID:
271867
Report Number(s):
CONF-950196--
Country of Publication:
United States
Language:
English

Similar Records

Design criteria manual guides CEM project
Journal Article · Tue Aug 01 00:00:00 EDT 1995 · Power Engineering (Barrington) · OSTI ID:103664

Software for CAA compliance
Journal Article · Wed Nov 30 23:00:00 EST 1994 · Power; (United States) · OSTI ID:6545702

CEMS deadlines are near, utilities must get ready
Journal Article · Tue Jun 01 00:00:00 EDT 1993 · Electric Light and Power (Boston); (United States) · OSTI ID:5034253