Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-108), Satsop-Aberdeen #2
- Bonneville Power Administration, Portland, OR (United States)
Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line. See Section 1of the attached checklist for a complete description of the proposal.
- Research Organization:
- Bonneville Power Administration, Portland, OR (United States)
- Sponsoring Organization:
- USDOE Office of NEPA Policy and Assistance (EH-42)
- OSTI ID:
- 824760
- Report Number(s):
- DOE/EIS-0285/SA-108
- Country of Publication:
- United States
- Language:
- English
Similar Records
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 107, Elma-Cosmopolis #1
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-128 - Olympia-Satsop #3 [Mile 1-6])