Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-115, Shelton- Fairmount # 1-4)

Technical Report ·
DOI:https://doi.org/10.2172/824177· OSTI ID:824177
 [1]
  1. Bonneville Power Administration, Portland, OR (United States)
Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 1.5 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated 35 feet from center of poles and or tower legs using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line. See Section 1of the attached checklist for a complete description of the proposal.
Research Organization:
Bonneville Power Administration, Portland, OR (United States)
Sponsoring Organization:
USDOE Office of NEPA Policy and Assistance (EH-42)
OSTI ID:
824177
Report Number(s):
DOE/EIS-0285/SA--115
Country of Publication:
United States
Language:
English