skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: RF MODES IN THE PEP-II SHIELDED VERTEX BELLOWS

Technical Report ·
DOI:https://doi.org/10.2172/813229· OSTI ID:813229

Experimental and simulation study of RF modes were carried out for the complicated geometry of the shielded vertex bellows near the IP region of the PEP-II B-factory. A beam position monitor button electrode located 50 cm from the bellows provides a signal for spectrum measurement. Calculations indicate monopole, dipole and quadrupole modes can exist in the bellows structure near the experimentally observed frequency region of 5 GHz. The observed modes are correlated to the bellows heating. The beam-generated fields are scattered by the masks, taper and axial offsets and heat the bellows by coupling through the RF shield fingers.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Science (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
813229
Report Number(s):
SLAC-PUB-9952; TRN: US0303763
Resource Relation:
Other Information: PBD: 10 Jun 2003
Country of Publication:
United States
Language:
English

Similar Records

Damping Higher Order Modes in the PEP-II B-Factory Vertex Bellows
Conference · Thu Jun 30 00:00:00 EDT 2005 · OSTI ID:813229

Effect of TE Mode Power on the PEP II LER BPM System
Conference · Fri Aug 26 00:00:00 EDT 2011 · Conf.Proc.C970512:2116,1997 · OSTI ID:813229

Simulation of HOM Leakage in the PEP-II Bellows
Conference · Tue Jun 07 00:00:00 EDT 2005 · OSTI ID:813229