Area 2 Bitcutter and Post-Shot Injection Wells Corrective Action Unit 90 Post-Closure Inspection Annual Report
Area 2 Bitcutter and Post-Shot Containment Wells Corrective Action Unit (CAU) 90 Post-Closure Monitoring requirements are described in {section} VIIB.8.b of the Nevada Test Site Resource Conservation and Recovery Act Permit for a Hazardous Waste Management Facility No. NEV HW009, reissued November 20, 2000, Revision 4. Post-closure care consists of the following: Semiannual inspections of the unit using an inspection checklist; photographic documentation; field note documentation; and preparation and submittal of an annual report. The report includes copies of the inspection checklist, photographs, and recommendations and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachment C.
- Research Organization:
- Bechtel Nevada Corporation (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC08-96NV11718
- OSTI ID:
- 790043
- Report Number(s):
- DOE/NV-753; DOE/NV/11718-603; TRN: US200202%%162
- Resource Relation:
- Other Information: PBD: 1 Sep 2001
- Country of Publication:
- United States
- Language:
- English
Similar Records
Post-Closure Inspection Report for Corrective Action Unit 90: Area 2 Bitcutter Containment Annual Report, Nevada Test Site, Nevada
POST CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 90: AREA 2 BITCUTTER CONTAINMENT, NEVADA TEST SITE, NEVADA, FOR THE PERIOD JULY 2004 - JUNE 2005