Area 2 Bitcutter and Post-Shot Injection Wells: Corrective Action Unit 90 Post-Closure Inspection Annual Report
Area 2 Bitcutter and Post-Shot Containment Shop Injection Wells Corrective Action Unit (CAU) 90 Post-Closure Monitoring requirements are described in section V.B.8.b of the Nevada Test Site Resource Conservation and Recovery Act Permit for a Hazardous Waste Management Facility No. NEV HW009, modified May 31, 1997, Revision 3. Post-closure care consists of the following: Semiannual inspections of the unit using an inspection checklist; Photographic documentation; Field note documentation; and Preparation and submittal of an annual report. The report includes copies of the inspection checklist, photographs, and recommendations and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachment C.
- Research Organization:
- Bechtel Nevada Corporation (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC08-96NV11718
- OSTI ID:
- 788443
- Report Number(s):
- DOE/NV/11718-648; TRN: AH200136%%30
- Resource Relation:
- Other Information: PBD: 1 Sep 2000
- Country of Publication:
- United States
- Language:
- English
Similar Records
Post-Closure Inspection Report for Corrective Action Unit 90: Area 2 Bitcutter Containment Annual Report, Nevada Test Site, Nevada
POST CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 90: AREA 2 BITCUTTER CONTAINMENT, NEVADA TEST SITE, NEVADA, FOR THE PERIOD JULY 2004 - JUNE 2005