skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Recent beam-beam experience with multiple high current bunches in PEP-II

Technical Report ·
DOI:https://doi.org/10.2172/753279· OSTI ID:753279

Operation with colliding beams at PEP-II has progressed remarkably well with over half the design specific luminosity and 5.2 x 10{sup 32}cm{sup {minus}2}s{sup {minus}1} in multiple bunches demonstrated during the last commissioning period before installation of the BABAR detector. Further luminosity increases are anticipated as the vertical beam size is reduced and beam currents are raised towards design values. At high currents interesting multibunch dynamics, which depend strongly on current distribution, have been observed during single-beam commissioning studies. Transverse beam instabilities nominally controlled using bunch-by-bunch feedback were observed to be significantly suppressed, in the absence of feedback, with beams in collision.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
753279
Report Number(s):
SLAC-PUB-8202; TRN: US0001901
Resource Relation:
Other Information: PBD: 7 Feb 2000
Country of Publication:
United States
Language:
English

Similar Records

Beam Beam Collisions at the PEP-II B Factory
Technical Report · Thu Apr 29 00:00:00 EDT 1999 · OSTI ID:753279

Increasing the Number of Bunches in PEP-II
Technical Report · Mon Jun 24 00:00:00 EDT 2002 · OSTI ID:753279

Measurements and Analysis of Longitudinal HOM Driven Coupled Bunch Modes in PEP-II Rings
Conference · Mon Jul 07 00:00:00 EDT 2008 · OSTI ID:753279