skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Measurement of Plutonium Ratios for CRM 137A Recertification

Technical Report ·
DOI:https://doi.org/10.2172/1994700· OSTI ID:1994700

This report documents the analytical methodologies used by the Chemical and Isotopics Mass Spectrometry (CIMS) Group at the US Department of Energy’s Oak Ridge National Laboratory (ORNL) for plutonium isotopic ratio characterizations on purified ~1 mg units prepared by Lawrence Livermore National Laboratory (LLNL) from a mother solution created from an existing 250 mg unit of certified reference material (CRM) 137. The analytical processes described are designed to maintain traceability of the final certified attributes and to eliminate sources of systematic bias for the measurements described. The measurands for certification are the plutonium isotope ratios: 238Pu/239Pu, 240Pu/239Pu, 241Pu/239Pu, and 242Pu/239Pu. The preparation and analytical process included the following activities: Preparation of reference materials to be used as calibrants to establish traceability to the SI unit of mass for the isotopic analyses and quality controls. For the plutonium isotopic analyses, CRM 128 (a CRM comprising equal atoms of 239Pu and 242Pu) was used as the primary calibrant; Each CRM 137A unit was reconstituted using dilute high-purity HNO3. From each, seven replicates were distributed for the isotopic characterizations by thermal ionization mass spectrometry (TIMS) using the total evaporation (TE) method for isotope ratio measurements and MC-ICP-MS using a dynamic peak hooping method for secondary isotope ratio measurements; Due to time delay in the analyses from the last purification of the original CRM 137 mother solution by LLNL, an aliquot of the three provided plutonium units was purified using Eichrom TEVA separation methods to remove americium in-growth and uranium impurities; Minimally corrected data were reported from each analysis using reporting templates provided by the New Brunswick Laboratory Program Office (NBL PO) for the specific methods used for isotopic measurements. In addition, a copy of the instrument exports, Excel templates for isotopic data corrections, and the uncertainty budgets completed with the GUM Workbench software package were submitted to NBL PO.

Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-00OR22725
OSTI ID:
1994700
Report Number(s):
ORNL/TM-2023/2854; TRN: US2404602
Country of Publication:
United States
Language:
English