Title: HYDRAULICS AND MIXING EVALUATIONS FOR NT-21/41 TANKS

Technical Report ·
DOI:https://doi.org/10.2172/1165020· OSTI ID:1165020

The hydraulic results demonstrate that pump head pressure of 20 psi recirculates about 5.6 liters/min flowrate through the existing 0.131-inch orifice when a valve connected to NT-41 is closed. In case of the valve open to NT-41, the solution flowrates to HB-Line tanks, NT-21 and NT-41, are found to be about 0.5 lpm and 5.2 lpm, respectively. The modeling calculations for the mixing operations of miscible fluids contained in the HB-Line tank NT-21 were performed by taking a three-dimensional Computational Fluid Dynamics (CFD) approach. The CFD modeling results were benchmarked against the literature results and the previous SRNL test results to validate the model. Final performance calculations were performed for the nominal case by using the validated model to quantify the mixing time for the HB-Line tank. The results demonstrate that when a pump recirculates a solution volume of 5.7 liters every minute out of the 72-liter tank contents containing two acid solutions of 2.7 M and 0 M concentrations (i.e., water), a minimum mixing time of 1.5 hours is adequate for the tank contents to get the tank contents adequately mixed. In addition, the sensitivity results for the tank contents of 8 M existing solution and 1.5 M incoming species show that the mixing time takes about 2 hours to get the solutions mixed.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
DE-AC09-08SR22470
OSTI ID:
1165020
Report Number(s):
SRNL-STI-2014-00513
Country of Publication:
United States
Language:
English

Similar Records

Hydraulic and mixing evaluations for SRS miscible liquid solutions
Conference · Fri Jul 01 00:00:00 EDT 2016 · OSTI ID:1165020

MIXING STUDY FOR JT-71/72 TANKS
Technical Report · Tue Nov 26 00:00:00 EST 2013 · OSTI ID:1165020

TANK 21 AND TANK 24 BLEND AND FEED STUDY: BLENDING TIMES, SETTLING TIMES, AND TRANSFERS
Technical Report · Thu May 31 00:00:00 EDT 2012 · OSTI ID:1165020