Utah FORGE: Ground Motion Study Report
Abstract
Paragon Geophysical contracted Urban Seismic Specialists to conduct A Ground Motion Study, on their Forge 3D project located near in Milford Utah .The test was conducted to measure the effects of the vibrator array on a pipeline owned by Kern River. Testing began November 22nd, and was completed on November 23rd. Demobilizing was completed on November 24, 2017
- Authors:
-
- Energy and Geoscience Institute at the University of Utah
- Publication Date:
- Other Number(s):
- 1035
- DOE Contract Number:
- EE0007080
- Research Org.:
- DOE Geothermal Data Repository; Energy and Geoscience Institute at the University of Utah
- Sponsoring Org.:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Geothermal Technologies Program (EE-2C)
- Collaborations:
- Energy and Geoscience Institute at the University of Utah
- Subject:
- 15 GEOTHERMAL ENERGY; EGS; FORGE; Milford; PPV; Roosevelt Hot Springs; Utah; Utah FORGE; demobilization; demobilizing; earthquake; energy; geophysics; geothermal; ground motion; monitoring; particle motion; peak particle velocity; report; seismic; seismicity; study; sweep testing; testing; vibrator; vibrator array
- OSTI Identifier:
- 1452762
- DOI:
- https://doi.org/10.15121/1452762
Citation Formats
Moore, Joe. Utah FORGE: Ground Motion Study Report. United States: N. p., 2018.
Web. doi:10.15121/1452762.
Moore, Joe. Utah FORGE: Ground Motion Study Report. United States. doi:https://doi.org/10.15121/1452762
Moore, Joe. 2018.
"Utah FORGE: Ground Motion Study Report". United States. doi:https://doi.org/10.15121/1452762. https://www.osti.gov/servlets/purl/1452762. Pub date:Fri Mar 16 04:00:00 UTC 2018
@article{osti_1452762,
title = {Utah FORGE: Ground Motion Study Report},
author = {Moore, Joe},
abstractNote = {Paragon Geophysical contracted Urban Seismic Specialists to conduct A Ground Motion Study, on their Forge 3D project located near in Milford Utah .The test was conducted to measure the effects of the vibrator array on a pipeline owned by Kern River. Testing began November 22nd, and was completed on November 23rd. Demobilizing was completed on November 24, 2017},
doi = {10.15121/1452762},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Mar 16 04:00:00 UTC 2018},
month = {Fri Mar 16 04:00:00 UTC 2018}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.
