105-H Reactor Interim Safe Storage Project Final Report
The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.
- Research Organization:
- Washington Closure Hanford (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC06-05RL14655
- OSTI ID:
- 972701
- Report Number(s):
- WCH-033
- Country of Publication:
- United States
- Language:
- English
Similar Records
DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization
Data quality objectives summary report for the 105-F and 105-DR Phase III below-grade structure and underlying soils
Interim Safe Storage of Plutonium Production Reactors at the US DOE Hanford Site - 13438
Technical Report
·
Thu Sep 15 00:00:00 EDT 2005
·
OSTI ID:972351
Data quality objectives summary report for the 105-F and 105-DR Phase III below-grade structure and underlying soils
Technical Report
·
Wed Sep 29 00:00:00 EDT 1999
·
OSTI ID:5570173
Interim Safe Storage of Plutonium Production Reactors at the US DOE Hanford Site - 13438
Conference
·
Mon Jul 01 00:00:00 EDT 2013
·
OSTI ID:22221406