Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

105-H Reactor Interim Safe Storage Project Final Report

Technical Report ·
DOI:https://doi.org/10.2172/972701· OSTI ID:972701
The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.
Research Organization:
Washington Closure Hanford (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC06-05RL14655
OSTI ID:
972701
Report Number(s):
WCH-033
Country of Publication:
United States
Language:
English