Title: Current and Future High Power Operation of Fermilab Main Injector

Conference ·
OSTI ID:952269

Fermilab's Main Injector on acceleration cycles to 120 GeV has been running a mixed mode operation delivering beam to both the antiproton source for pbar production and to the NuMI[1] target for neutrino production since 2005. On January 2008 the slip stacking process used to increase the beam to the pbar target was expanded to include the beam to the NuMI target increasing the MI beam power at 120 GeV to 400KW. The current high power MI operation will be described along with the plans to increase the power to 700KW for NOvA and to 2.1 MW for project X.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
952269
Report Number(s):
FERMILAB-CONF-09-151-AD; TRN: US0902460
Resource Relation:
Conference: Presented at Particle Accelerator Conference (PAC 09), Vancouver, BC, Canada, 4-8 May 2009
Country of Publication:
United States
Language:
English