Confirmatory Survey Report for the Quehanna Decommissioning Project, Karthaus, PA
The survey activities consisted of visual inspections and radiological surveys including beta and gamma surface scans and surface beta activity measurements.
- Research Organization:
- Oak Ridge Institute for Science and Education (ORISE), Oak Ridge, TN
- Sponsoring Organization:
- Work for Others: Nuclear Regulatory Commission
- DOE Contract Number:
- AC05-06OR23100
- OSTI ID:
- 937050
- Report Number(s):
- ORISE 1726-SR-01-0
- Country of Publication:
- United States
- Language:
- English
Similar Records
Confirmatory Survey Report for Area B1S/B2S at the Chevron Mining Washington Remediation Project, Washington, PA
Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Rancho Seco Nuclear Generating Station, Herald, CA
Revised-Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Rancho Seco Nuclear Generating Station, Herald, California
Technical Report
·
Mon Nov 19 23:00:00 EST 2007
·
OSTI ID:937071
Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Rancho Seco Nuclear Generating Station, Herald, CA
Technical Report
·
Thu Dec 06 23:00:00 EST 2007
·
OSTI ID:937048
Revised-Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Rancho Seco Nuclear Generating Station, Herald, California
Technical Report
·
Thu Dec 06 23:00:00 EST 2007
·
OSTI ID:941501