Confirmatory Survey Report for Area B1S/B2S at the Chevron Mining Washington Remediation Project, Washington, PA
During the period of October 2 and 3, 2007, the Oak Ridge Institute for Science and Education (ORISE) performed confirmatory radiological survey activities which included gamma surface scans within Area B1S/B2S and the collection of soil samples from these areas.
- Research Organization:
- Oak Ridge Institute for Science and Education (ORISE), Oak Ridge, TN
- Sponsoring Organization:
- Work for Others: Nuclear Regulatory Commission
- DOE Contract Number:
- AC05-06OR23100
- OSTI ID:
- 937071
- Report Number(s):
- ORISE 1706-SR-01-0
- Country of Publication:
- United States
- Language:
- English
Similar Records
Confirmatory Survey Results for the Emergency Operations Facility (EOF) at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut
Independent Confirmatory Survey Results of Soils Associated with the Argyle Street Sewer Line at the United Nuclear Corporation Naval Products Site, New Haven, Connecticut (Letter Report)
Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois
Technical Report
·
Tue Jul 03 00:00:00 EDT 2007
·
OSTI ID:925703
Independent Confirmatory Survey Results of Soils Associated with the Argyle Street Sewer Line at the United Nuclear Corporation Naval Products Site, New Haven, Connecticut (Letter Report)
Technical Report
·
Mon Jan 23 23:00:00 EST 2012
·
OSTI ID:1060160
Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois
Technical Report
·
Fri May 25 00:00:00 EDT 2007
·
OSTI ID:925702