Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Rancho Seco Nuclear Generating Station, Herald, CA
During the period of October 15 and 18, 2007, ORISE performed confirmatory radiological survey activities which included beta and gamma structural surface scans and beta activity direct measurements within the Auxiliary Building, beta or gamma scans within Turbine Building embedded piping, beta activity determinations within Turbine Building Drain 3-1-27, and gamma scans and the collection of a soil sample from the clay soils adjacent to the Lower Mixing Box.
- Research Organization:
- Oak Ridge Institute for Science and Education (ORISE), Oak Ridge, TN
- Sponsoring Organization:
- Work for Others: Nuclear Regulatory Commission
- DOE Contract Number:
- AC05-06OR23100
- OSTI ID:
- 937048
- Report Number(s):
- ORISE 1695-SR-01-0
- Country of Publication:
- United States
- Language:
- English
Similar Records
Revised-Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Rancho Seco Nuclear Generating Station, Herald, California
Confirmatory Survey Report for Area B1S/B2S at the Chevron Mining Washington Remediation Project, Washington, PA
Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois
Technical Report
·
Thu Dec 06 23:00:00 EST 2007
·
OSTI ID:941501
Confirmatory Survey Report for Area B1S/B2S at the Chevron Mining Washington Remediation Project, Washington, PA
Technical Report
·
Mon Nov 19 23:00:00 EST 2007
·
OSTI ID:937071
Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois
Technical Report
·
Fri May 25 00:00:00 EDT 2007
·
OSTI ID:925702