skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Progress of the PEP-II-B-factory

Conference ·
OSTI ID:842976

PEP-II is an e{sup +}e{sup -} B-Factory Collider located at SLAC operating at the Upsilon 4S resonance. PEP-II has delivered, over the past five years, an integrated luminosity to the BaBar detector of over 139 fb{sup -1} and has reached a luminosity of 6.58 x 10{sup 36}/cm{sup 2}/s. Steady progress is being made in reaching higher luminosity. The goal over the next several years is to reach a luminosity of at least 2 x 10{sup 34}/cm{sup 2}/s. The accelerator physics issues being addressed in PEP-II to reach this goal include the electron cloud instability, beam-beam effects, parasitic beam-beam effects, high RF beam loading, shorter bunches, lower beta y*, interaction region operation, and coupling control. A view of the PEP-II tunnel is shown in Figure 1. The present parameters of the PEP-II B-Factory are shown in Table 1 compared to the design. The present peak luminosity is 219% of design and the best integrated luminosity per month is 7.4 fb{sup -1} that is 225% of design. The best luminosity per month is shown in Figure 2. The integrated luminosity over a month is shown in Figure 3 and the total integrated luminosity in shown in Figure 4. The progress in luminosity has come from correcting the orbits, adding specific orbit bumps to correct coupling and dispersion issues, lowering the beta y* in the LER, and moving the fractional horizontal tunes in both rings to just above the half integer (<0.52).

Research Organization:
Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC03-76SF00098
OSTI ID:
842976
Report Number(s):
LBNL-55924; CBP Note - 622; TRN: US0503788
Resource Relation:
Conference: 2003 Particle Accelerator Conference, Portland, May 12-16, 2003
Country of Publication:
United States
Language:
English

Similar Records

PROGRESS OF THE PEP-II B-FACTORY
Technical Report · Fri Dec 05 00:00:00 EST 2003 · OSTI ID:842976

Results and Plans of the PEP-II B-Factory
Technical Report · Tue Jul 06 00:00:00 EDT 2004 · OSTI ID:842976

Performance of the PEP-II B-Factory Collider at SLAC
Conference · Fri Mar 03 00:00:00 EST 2006 · OSTI ID:842976