Performance of the PEP-II B-Factory Collider at SLAC
PEP-II is an e{sup +}e{sup -} asymmetric B-Factory Collider located at SLAC operating at the Upsilon 4S resonance (3.1 GeV x 9 GeV). It has reached a luminosity of 9.21 x 10{sup 33}/cm{sup 2}/s and has delivered an integrated luminosity of 710 pb{sup -1} in one day. PEP-II has delivered, over the past six years, an integrated luminosity to the BaBar detector of over 262 fb{sup -1}. PEP-II operates in continuous injection mode for both beams boosting the integrated luminosity. The peak positron current has reached 2.45 A in 1588 bunches. Steady progress is being made in reaching higher luminosity. The goal over the next several years is to reach a luminosity of 2.1 x 10{sup 34}/cm{sup 2}/s. The accelerator physics issues being addressed in PEP-II to reach this goal include the electron cloud instability, beam-beam effects, parasitic beam-beam effects, high RF beam loading, shorter bunches, lower {beta}*{sub y} interaction region operation, and coupling control. Figure 1 shows the PEP-II tunnel.
- Research Organization:
- SLAC National Accelerator Lab., Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-76SF00515
- OSTI ID:
- 877216
- Report Number(s):
- SLAC-PUB-11727; TRN: US0601304
- Resource Relation:
- Conference: Prepared for Particle Accelerator Conference (PAC 05), Knoxville, Tennessee, 16-20 May 2005
- Country of Publication:
- United States
- Language:
- English
Similar Records
Progress of the PEP-II-B-factory
PROGRESS OF THE PEP-II B-FACTORY