Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Project W-519 TWRS privatization phase 1 infrastructure year 2000 compliance assessment project plan

Technical Report ·
DOI:https://doi.org/10.2172/797742· OSTI ID:797742
This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-519, Tank Waste Remediation System Privatization Phase I Infrastructure Support. The purpose of this assessment is to give an overview of the project. This assessment will describe the methods, protocols, and practices to assure that equipment and systems do not have Y2K problems. This document will not be updated and any dates contained in this document are estimates and may change. The scope of project W-519 is to provide utilities and infrastructure to support construction and operation of the private contractor's facility to treat, immobilize, and dispose of tank waste. The private contractor's facility will be located on east side of 200E-area and north of Route 4s (near the defunct grout vaults). The utilities include potable and process water, construction and operational electrical power systems, and liquid effluent disposal transfer lines to the existing effluent treatment facility (ETF) and the liquid effluent retention facility (LERF).
Research Organization:
NHC (US)
Sponsoring Organization:
ENVIRONMENTAL MANAGEMENT (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
797742
Report Number(s):
HNF-4857, Rev.0
Country of Publication:
United States
Language:
English

Similar Records

Interface control document for tank waste remediation system privatization phase 1 infrastructure support Project W-519
Technical Report · Thu Apr 23 00:00:00 EDT 1998 · OSTI ID:353288

TWRS phase 1 infrastructure project (W-519) characterization
Technical Report · Thu Sep 24 00:00:00 EDT 1998 · OSTI ID:10148438

TWRS privatization phase 1 electrical power system
Technical Report · Fri May 30 00:00:00 EDT 1997 · OSTI ID:10154232