The U1h Shaft Project is a design/build subcontract to construct one 6.1 meter (m) (20 feet (ft)) finished diameter shaft to a depth of 321.6 m (1,055 ft.) at the Nevada Test Site. Atkinson Construction was subcontracted by Bechtel Nevada to construct the U1h Shaft for the U.S. Department of Energy. The project consists of furnishing and installing the sinking plant, construction of the 321.6 m (1,055 ft.) of concrete lined shaft, development of a shaft station at a depth of 297.5 m (976 ft.), and construction of a loading pocket at the station. The outfitting of the shaft and installation of a new hoist may be incorporated into the project at a later date. This paper will describe the design phase, the excavation and lining operation, shaft station construction and the contractual challenges encountered on this project.

Research Organization:
Bechtel Nevada Corp., NV (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC08-96NV11718
OSTI ID:
776490
Report Number(s):
DOE/NV/11718--445
Country of Publication:
United States
Language:
English

Similar Records

U1h shaft project
Conference · Fri Jun 30 00:00:00 EDT 2000 · OSTI ID:758113

U1h Superstructure
Journal Article · Tue Oct 31 23:00:00 EST 2000 · Clark's Construction Superstructure Newletter · OSTI ID:768020

Construction features of the exploratory shaft at Yucca Mountain
Conference · Sun Dec 30 23:00:00 EST 1984 · OSTI ID:59077