The U1h shaft project is a design/build subcontract to construct one 20 foot (ft) finished diameter shaft to a depth of 1,045 ft at the Nevada Test Site. Atkinson Construction was subcontracted by Bechtel Nevada to construct the U1h Shaft for the Department of Energy. The project consists of furnishing and installing the sinking plant, construction of the 1,045 ft of concrete lined shaft, development of a shaft station at a depth of 976 ft, and construction of a loading pocket at the station. The outfitting of the shaft and installation of a new hoist may be incorporated into the project at a later date. This paper should be of interest to those involved with the construction of relatively deep shafts and underground excavations.

Research Organization:
Bechtel Nevada Corporation (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC08-96NV11718
OSTI ID:
758113
Report Number(s):
DOE/NV/11718--445-ABS
Country of Publication:
United States
Language:
English

Similar Records

Shaft Sinking at the Nevada Test Site, U1h Shaft Project
Conference · Wed Feb 28 23:00:00 EST 2001 · OSTI ID:776490

U1h Superstructure
Journal Article · Tue Oct 31 23:00:00 EST 2000 · Clark's Construction Superstructure Newletter · OSTI ID:768020

Construction features of the Exploratory Shaft at Yucca Mountain
Conference · Sun Dec 30 23:00:00 EST 1984 · OSTI ID:59829