The U1h shaft project is a design/build subcontract to construct one 20 foot (ft) finished diameter shaft to a depth of 1,045 ft at the Nevada Test Site. Atkinson Construction was subcontracted by Bechtel Nevada to construct the U1h Shaft for the Department of Energy. The project consists of furnishing and installing the sinking plant, construction of the 1,045 ft of concrete lined shaft, development of a shaft station at a depth of 976 ft, and construction of a loading pocket at the station. The outfitting of the shaft and installation of a new hoist may be incorporated into the project at a later date. This paper should be of interest to those involved with the construction of relatively deep shafts and underground excavations.
- Research Organization:
- Bechtel Nevada Corporation (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC08-96NV11718
- OSTI ID:
- 758113
- Report Number(s):
- DOE/NV/11718--445-ABS
- Country of Publication:
- United States
- Language:
- English
Similar Records
Shaft Sinking at the Nevada Test Site, U1h Shaft Project
U1h Superstructure
Construction features of the Exploratory Shaft at Yucca Mountain
Conference
·
Wed Feb 28 23:00:00 EST 2001
·
OSTI ID:776490
U1h Superstructure
Journal Article
·
Tue Oct 31 23:00:00 EST 2000
· Clark's Construction Superstructure Newletter
·
OSTI ID:768020
Construction features of the Exploratory Shaft at Yucca Mountain
Conference
·
Sun Dec 30 23:00:00 EST 1984
·
OSTI ID:59829