Construction features of the Exploratory Shaft at Yucca Mountain

Conference ·
OSTI ID:59829

The Exploratory Shaft (ES) at Yucca Mountain is planned to be constructed during 1985 and 1986 as part of the detailed site characterization for one of three sites which may be selected as candidates for location of a high-level radioactive waste repository. Conventional mining methods will be used for the shaft sinking phase of the ES project. The ES will be comprised of surface support facilities, a 1,480-foot-deep circular shaft lined with concrete to a finished inside diameter of 12 feet, lateral excavations and test installations extending up to 200 feet from the shaft, and long lateral borings extending up to 2,300 feet from the shaft. The estimated time for sinking the shaft to a total depth of about 1,480 feet and completing the lateral excavations and borings is about two years. The major underground development planned for the primary test level at a depth of 1,200 feet consists of the equivalent of 1,150 feet of 15- by 15-foot drift. The total volume of rock to be removed from the shaft proper and the lateral excavations totals about 1/2 million cubic feet. Construction equipment for the shaft and underground excavation phases consists of conventional mine hoisting equipment, shot hole and rock bolt drilling jumbos, mucking machines, and hauling machines. The desire to maintain relatively uniform and even walls in selected shaft and drift intervals will require that controlled blasting techniques be employed. Such techniques generally classified as "smooth blasting" are commonly used for excavation in the construction industry.

Research Organization:
Reynolds Electrical & Engineering Co., Inc.
OSTI ID:
59829
Report Number(s):
CONF-840307--
Country of Publication:
United States
Language:
English

Similar Records

Construction features of the exploratory shaft at Yucca Mountain
Conference · Sun Dec 30 23:00:00 EST 1984 · OSTI ID:59077

U1h shaft project
Conference · Fri Jun 30 00:00:00 EDT 2000 · OSTI ID:758113

U1h Superstructure
Journal Article · Tue Oct 31 23:00:00 EST 2000 · Clark's Construction Superstructure Newletter · OSTI ID:768020