The Exploratory Shaft (ES) at Yucca Mountain is planned to be constructed during 1985 and 1986 as part of the detailed site characterization for one of three sites which may be selected as candidates for location of a high-level radioactive waste repository. Conventional mining methods will be used for the shaft sinking phase of the ES project. The ES will be comprised of surface support facilities, a 1480-ft-deep circular shaft lined with concrete to a finished inside diameter of 12 ft, lateral excavations and test installations extending up to 200 ft from the shaft, and long lateral borings extending up to 2300 ft from the shaft. The estimated time for sinking the shaft to a total depth of about 1480 ft and completing the lateral excavations and borings is about two years. The major underground development planned for the primary test level at a depth of 1200 ft consists of the equivalent of 1150 ft of 15- by 15-ft drift. The total volume of rock to be removed from the shaft proper and the lateral excavations totals about 1/2 million cubic feet. Construction equipment for the shaft and underground excavation phases consists of conventional mine hoisting equipment, shot hole and rock bolt drilling jumbos, mucking machines, and hauling machines. The desire to maintain relatively uniform and even walls in selected shaft and drift intervals will require that controlled blasting techniques be employed. Certain lateral boring operations associated with tests to be conducted in the underground development may pose some unusual problems or require specialized equipment. One of the operations is boring and lining a 30-in.-diam by 600-ft-long horizontal hole with a boring machine being developed under the direction of Sandia National Laboratories. Another special operation is coring long lateral holes (500 to 2000 ft) with minimum use of liquid circulating fluids. 8 figures.

Research Organization:
Reynolds Electrical and Engineering Co., Inc., Las Vegas, NV (United States); USDOE Nevada Operations Office, Las Vegas, NV (United States)
DOE Contract Number:
AC08-84NV10327
OSTI ID:
59077
Report Number(s):
CONF-840307--3; ON: DE84007342
Country of Publication:
United States
Language:
English

Similar Records

Construction features of the Exploratory Shaft at Yucca Mountain
Conference · Sun Dec 30 23:00:00 EST 1984 · OSTI ID:59829

U1h shaft project
Conference · Fri Jun 30 00:00:00 EDT 2000 · OSTI ID:758113

U1h Superstructure
Journal Article · Tue Oct 31 23:00:00 EST 2000 · Clark's Construction Superstructure Newletter · OSTI ID:768020