Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Technical and environmental considerations in the design of the Square Butte HVDC transmission terminals

Conference · · Proc. Am. Power Conf.; (United States)
OSTI ID:6982462
 [1]; ;
  1. Minnesota Power and Light Co., Duluth
The technical and environmental considerations involved in HVDC Converter Terminal design with respect to the Square Butte HVDC Project are reported. Considerations are encountered in HVDC stations which are not generally familiar to the utility engineer involved with AC systems. Design of the transmission line is not covered.
OSTI ID:
6982462
Report Number(s):
CONF-770403-
Conference Information:
Journal Name: Proc. Am. Power Conf.; (United States) Journal Volume: 39
Country of Publication:
United States
Language:
English

Similar Records

Square Butte advances HVDC technology
Journal Article · Tue Feb 28 23:00:00 EST 1978 · Transm. Distrib.; (United States) · OSTI ID:5148476

Square Butte's HVDC Project sends coal by wire 456 miles
Journal Article · Wed Jun 01 00:00:00 EDT 1977 · Electr. Light Power (Boston); (United States) · OSTI ID:7218955

Square Butte HVDC transmission system is completed. [250 kV]
Journal Article · Fri Jul 01 00:00:00 EDT 1977 · Transm. Distrib.; (United States) · OSTI ID:7253641