Several states require electric utilities to include estimates of external environmental costs ( adders'') in economic comparisons of conservation and supply alternatives by electric utilities. What are these costs when emissions are subject to a tradeable allowance system, as SO[sub 2] emissions by US utilities are In the simplest case, the social cost of additional emissions at a location then equals: (1) The allowance price plus (2) the external cost of those emissions minus the external costs avoided because emissions at other locations decrease. Emissions elsewhere must decrease because the total number of allowances is fixed. Since allowances are an internal cost, the appropriate adder is just the second quantity. Its value can be positive or negative. If negative, this implies that the local state regulatory commission should encourage emissions in it jurisdiction because they cause less damage then if emitted elsewhere. The general results is unaffected by the presence of local emission restrictions. However, if other jurisdictions also impose adders, the social cost expression becomes more complex.
- OSTI ID:
- 6877188
- Journal Information:
- Journal of Energy Engineering; (United States), Journal Name: Journal of Energy Engineering; (United States) Vol. 120:3; ISSN JLEED9; ISSN 0733-9402
- Country of Publication:
- United States
- Language:
- English
Similar Records
Weighing environmental externalities: How to do it right
SO{sub 2} allowance trading: What rules apply?
Environmental externality surcharges in power system planning: A case study of New England
Journal Article
·
Tue Sep 01 00:00:00 EDT 1992
· Electricity Journal; (United States)
·
OSTI ID:6909445
SO{sub 2} allowance trading: What rules apply?
Journal Article
·
Thu Sep 15 00:00:00 EDT 1994
· Fortnightly
·
OSTI ID:451260
Environmental externality surcharges in power system planning: A case study of New England
Journal Article
·
Sun Aug 01 00:00:00 EDT 1993
· IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States)
·
OSTI ID:5676268
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200202 -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
29 ENERGY PLANNING, POLICY, AND ECONOMY
290300 -- Energy Planning & Policy-- Environment
Health
& Safety
296000* -- Energy Planning & Policy-- Electric Power
AIR POLLUTION CONTROL
ALLOCATIONS
CHALCOGENIDES
CONTROL
ECONOMIC ANALYSIS
ECONOMICS
ELECTRIC UTILITIES
FOSSIL-FUEL POWER PLANTS
INSTITUTIONAL FACTORS
OXIDES
OXYGEN COMPOUNDS
POLLUTION CONTROL
POWER PLANTS
PUBLIC UTILITIES
SOCIO-ECONOMIC FACTORS
SULFUR COMPOUNDS
SULFUR DIOXIDE
SULFUR OXIDES
THERMAL POWER PLANTS
200202 -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
29 ENERGY PLANNING, POLICY, AND ECONOMY
290300 -- Energy Planning & Policy-- Environment
Health
& Safety
296000* -- Energy Planning & Policy-- Electric Power
AIR POLLUTION CONTROL
ALLOCATIONS
CHALCOGENIDES
CONTROL
ECONOMIC ANALYSIS
ECONOMICS
ELECTRIC UTILITIES
FOSSIL-FUEL POWER PLANTS
INSTITUTIONAL FACTORS
OXIDES
OXYGEN COMPOUNDS
POLLUTION CONTROL
POWER PLANTS
PUBLIC UTILITIES
SOCIO-ECONOMIC FACTORS
SULFUR COMPOUNDS
SULFUR DIOXIDE
SULFUR OXIDES
THERMAL POWER PLANTS