Develop and test fuel-cell-powered on-site integrated total-energy systems: Phase III, full-scale power plant development. 5th quarterly report, February-April, 1982
Technical Report
·
OSTI ID:6867846
Satisfactory performance is reported for the first 12-cell sub-stack of the 5 kW rebuild using improved ABA reactant distribution plates. Construction and test results are described for the first full-sized single-cell test (0.33 m x 0.56 m). Test duration was 450 hours. Plans are outlined for construction and testing of two methanol reformer units based on commercially-available shell-and-tube heat exchangers. A 5 kW-equivalent precursor and a 50 kW-equivalent prototype will be built. Supporting design and single-tube experimental data are presented. Stack support efforts are summarized on corrosion currents of graphite materials and acid-management of single-cell test facilities. Comparative properties are summarized for the two methanol/steam reforming catalysts evaluated under Tak V (now completed): T2107RS and C70-2RS.
- Research Organization:
- Engelhard Corp., Edison, NJ (USA). Engelhard Industries Div.
- DOE Contract Number:
- AI01-80ET17088
- OSTI ID:
- 6867846
- Report Number(s):
- DOE/NASA-0241-5; NASA-CR-168020; ON: DE83005613
- Country of Publication:
- United States
- Language:
- English
Similar Records
Develop and test fuel-cell-powered on-site integrated total-energy systems. Phase III. Full-scale power plant development. 6th quarterly report, May-July 1982
Develop and test fuel-cell-powered on-site integrated total-energy systems: Phase III, full-scale power-plant development. Fourth quarterly report, November 1981-January 1982
Develop and test fuel-cell-powered on-site integrated total-energy systems: Phase III, full-scale power-plant development. Second quarterly report, May-July 1981
Technical Report
·
Tue Apr 19 23:00:00 EST 1983
·
OSTI ID:6012744
Develop and test fuel-cell-powered on-site integrated total-energy systems: Phase III, full-scale power-plant development. Fourth quarterly report, November 1981-January 1982
Technical Report
·
Mon Jun 21 00:00:00 EDT 1982
·
OSTI ID:5084546
Develop and test fuel-cell-powered on-site integrated total-energy systems: Phase III, full-scale power-plant development. Second quarterly report, May-July 1981
Technical Report
·
Tue Aug 25 00:00:00 EDT 1981
·
OSTI ID:5512411
Related Subjects
29 ENERGY PLANNING, POLICY, AND ECONOMY
290800 -- Energy Planning & Policy-- Heat Utilization-- (1980-)
30 DIRECT ENERGY CONVERSION
300501* -- Fuel Cells-- Design & Development
ACID ELECTROLYTE FUEL CELLS
ALCOHOLS
CHEMICAL REACTIONS
CONSTRUCTION
CORROSION
DESIGN
DIRECT ENERGY CONVERTERS
ELECTROCHEMICAL CELLS
ENERGY SYSTEMS
FUEL CELLS
FUEL SYSTEMS
GAS GENERATORS
HYDROGEN COMPOUNDS
HYDROGEN GENERATORS
HYDROGEN PRODUCTION
HYDROXY COMPOUNDS
IEUS
INORGANIC ACIDS
METHANOL
ON-SITE POWER GENERATION
ORGANIC COMPOUNDS
PERFORMANCE TESTING
PHOSPHORIC ACID
POWER GENERATION
POWER RANGE 1-10 KW
REFORMER PROCESSES
STEAM REFORMER PROCESSES
TESTING
TOTAL ENERGY SYSTEMS
290800 -- Energy Planning & Policy-- Heat Utilization-- (1980-)
30 DIRECT ENERGY CONVERSION
300501* -- Fuel Cells-- Design & Development
ACID ELECTROLYTE FUEL CELLS
ALCOHOLS
CHEMICAL REACTIONS
CONSTRUCTION
CORROSION
DESIGN
DIRECT ENERGY CONVERTERS
ELECTROCHEMICAL CELLS
ENERGY SYSTEMS
FUEL CELLS
FUEL SYSTEMS
GAS GENERATORS
HYDROGEN COMPOUNDS
HYDROGEN GENERATORS
HYDROGEN PRODUCTION
HYDROXY COMPOUNDS
IEUS
INORGANIC ACIDS
METHANOL
ON-SITE POWER GENERATION
ORGANIC COMPOUNDS
PERFORMANCE TESTING
PHOSPHORIC ACID
POWER GENERATION
POWER RANGE 1-10 KW
REFORMER PROCESSES
STEAM REFORMER PROCESSES
TESTING
TOTAL ENERGY SYSTEMS