Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Develop and test fuel-cell-powered on-site integrated total-energy systems: Phase III, full-scale power-plant development. Second quarterly report, May-July 1981

Technical Report ·
OSTI ID:5512411
A schematic and physical layout is given for the 5 kW integrated system, and the status of individual components is described. The results of using a one-dimensional mathematical model of the 5 kW reformer are presented. Plans for a single-tube reformer test unit for the acquisition of temperature profile data are described. Tentative specifications for a 50 kW dc-to-ac inverter are listed. Performance data are given on two 3-cell stacks incorporating semi-automatic acid replenishment systems and improved electrocatalysts. A qualification test on methanol/steam reforming catalyst T2107RS is reported, including a portion in which the catalyst was deliberately poisoned with 800 ppM ethanol in the feed.
Research Organization:
National Aeronautics and Space Administration, Washington, DC (USA); Engelhard Minerals and Chemicals Corp., Edison, NJ (USA). Engelhard Industries Div.
DOE Contract Number:
AI01-80ET17088
OSTI ID:
5512411
Report Number(s):
DOE/NASA/0241-2; NASA-CR-165455; ON: DE82010793
Country of Publication:
United States
Language:
English