Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: full-scale power plant development

Technical Report ·
OSTI ID:6942637
A schematic and physical layout is given for the 5kW integrated system and the development status of individual components is described. The results of using a one dimensional mathematical model of the 5kW reformer are presented. Plans for a single-tube reformer test unit for the acquisition of temperature profile data are described. Tentative specifications for a 50kW dc-to-ac inverter are listed. Performance data are given on two 3-cell stacks incorporating semiautomatic acid replenishment systems and improved electrocatalysts. A qualification test on methanol/steam reforming catalyst T2107RS is reported, including a portion in which the catalyst was deliberately poisoned with 800 ppm ethanol in the feed.
Research Organization:
Englehard Industries, Edison, NJ (USA)
OSTI ID:
6942637
Report Number(s):
NASA-CR-165455
Country of Publication:
United States
Language:
English