Develop and test fuel-cell-powered on-site integrated total-energy systems. Phase III. Full-scale power plant development. 6th quarterly report, May-July 1982

Technical Report ·
OSTI ID:6012744
Satisfactory performance is reported for the three 12-cell sub-stacks of the 5 kW stack rebuild. Early general conclusions are presented from an economic study of OS/IES by subcontractor Arthur D. Little, Inc. Results are reported on a successful 700-hour test of a 3-cell stack in the full-sized configuration (0.33 m x 0.56 m). Construction of a 5-kW-equivalent methanol/steam reformer based on a commercial shell-and-tube heat exchanger was completed. Several test runs are summarized. Preliminary conclusions are presented on the technical and economic aspects of fuel cell/HVAC interaction for OS/IES as developed by the subcontractor, Trane Company. Physical data are presented on several dense graphite materials which are candidates for gas-distribution plates. Performance of a new cathode catalyst is reported.
Research Organization:
Engelhard Corp., Edison, NJ (USA). Engelhard Industries Div.
DOE Contract Number:
AI01-80ET17088
OSTI ID:
6012744
Report Number(s):
DOE/NASA/0241-6; NASA-CR-168021; ON: DE83012979