Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Breckinridge Project, initial effort. Report III, Volume 2. Specifications

Technical Report ·
DOI:https://doi.org/10.2172/6837840· OSTI ID:6837840
Report III, Volume 2 contains those specifications numbered K through Y, as follows: Specifications for Compressors (K); Specifications for Piping (L); Specifications for Structures (M); Specifications for Insulation (N); Specifications for Electrical (P); Specifications for Concrete (Q); Specifications for Civil (S); Specifications for Welding (W); Specifications for Painting (X); and Specifications for Special (Y). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available for the Initial Effort (Phase Zero) work performed by all contractors and subcontractors.
Research Organization:
Ashland Synthetic Fuels, Inc., KY (USA); Airco Energy Co., Inc., Ashland, KY (USA)
DOE Contract Number:
FC05-80OR20717
OSTI ID:
6837840
Report Number(s):
DOE/OR/20717-3-Vol.2; ON: DE83000184
Country of Publication:
United States
Language:
English