Breckinridge Project, initial effort

Technical Report ·
DOI:https://doi.org/10.2172/6924688· OSTI ID:6924688
Report III, Volume 1 contains those specifications numbered A through J, as follows: General Specifications (A); Specifications for Pressure Vessels (C); Specifications for Tanks (D); Specifications for Exchangers (E); Specifications for Fired Heaters (F); Specifications for Pumps and Drivers (G); and Specifications for Instrumentation (J). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project, and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available to the Initial Effort (Phase Zero) work performed by all contractors and subcontractors. Report III, Volume 1 also contains the unique specifications prepared for Plants 8, 15, and 27. These specifications will be substantially reviewed during Phase I of the project, and modified as necessary for use during the engineering, procurement, and construction of this project.
Research Organization:
Ashland Synthetic Fuels, Inc., KY (United States); Airco Energy Co., Inc., Ashland, KY (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
FC05-80OR20717
OSTI ID:
6924688
Report Number(s):
DOE/OR/20717--3-Vol.1; ON: DE83000185