SMUDPV2: Quarterly performance report No. 3 for the period October through December 1986
Technical Report
·
OSTI ID:6526220
SMUDPV2 is a nominal 1 MWac photovoltaic (PV) power plant located adjacent to the Rancho Seco generating station, 30 miles southeast of Sacramento, California. The design and construction of PV2 was a joint effort between the Sacramento Municipal Utility District (SMUD) and the United States Department of Energy (EOE). It is the second phase of a multiphase PV power plant project with a planned generating capacity of 100 MWac. SMUD's primary objective in this project is to install a PV power plant that will add economical energy generation capacity to their system. To this end, the data generated by the operation of PV2 will be used by SMUD to verify the value of PV to the rate payers of Sacramento, to assess the specific performance of the PV2 design, and to facilitate planning, design, and construction of future phases.
- Research Organization:
- Sacramento Municipal Utility District, CA (USA)
- DOE Contract Number:
- FC03-83CE11968; FC03-82CE30701
- OSTI ID:
- 6526220
- Report Number(s):
- DOE/CE/11968-T1; ON: DE87006398
- Country of Publication:
- United States
- Language:
- English
Similar Records
SMUDPV2 quarterly performance report IV for the period January through March 1987
Plant performance for PV1 and PV2: SMUD (Sacramento Municipal Utility District) PV2, Final report 2, April 1986-March 1987
Putting the sun to work in Sacramento
Technical Report
·
Tue Mar 31 23:00:00 EST 1987
·
OSTI ID:6387095
Plant performance for PV1 and PV2: SMUD (Sacramento Municipal Utility District) PV2, Final report 2, April 1986-March 1987
Technical Report
·
Mon Feb 29 23:00:00 EST 1988
·
OSTI ID:5323069
Putting the sun to work in Sacramento
Journal Article
·
Thu Jun 01 00:00:00 EDT 2000
· Solar Today
·
OSTI ID:20080314