Plant performance for PV1 and PV2: SMUD (Sacramento Municipal Utility District) PV2, Final report 2, April 1986-March 1987

Technical Report ·
OSTI ID:5323069

The Sacramento Municipal Utility Distric (SMUD) photovoltaic project is a phased installation of a 100 megawatt central station photovoltaic (PV) power plant that is being constructed adjacent to the Rancho Seco Nuclear Generating Station, 30 miles southeast of Sacramento, California. SMUD, with cofunding from the U.S. Department of Energy (DOE) and the California State Department of Enrgy has designed, procured, installed, and operated two 1,000 kilowatt power generating plants (PV1 and PV2) as the first two phases of the project (Figure No. 1). PV1 deferred for budgetary reasons and to evaluate new PV technologies. Long-range load projections for the SMUD service area indicate theneed for new peaking power generation. Plans prior to the initiation of this project included coal-fired, hydroelectric and geothermal power plants. Environmental and permitting constraints within California introduced considerable uncertainty into the timing and cost of other generation options. This projectwas, therefore, initiated to proide an economic and technical basis for future electrical generation using solar energy. Ther performance data presented herein was measured, stored, and reduced by the onsite plant control and data acquisition computer.

Research Organization:
Sacramento Municipal Utility District, CA (USA)
DOE Contract Number:
FC03-83CE11968; FC03-82CE30701
OSTI ID:
5323069
Report Number(s):
DOE/CE/11968-T2; ON: DE88007286
Country of Publication:
United States
Language:
English